Screw Pile Installers was engaged to complete screw pile foundation installations for modular homes in Fort Smith, NWT, supporting residential development for Salt River First Nation. The project required a foundation system capable of performing reliably in challenging soil conditions while allowing for fast deployment and precise installation.
Our team completed site layout and pile positioning before installing screw piles to engineered depth and torque specifications. Each pile was carefully aligned to ensure consistent elevations and proper load distribution for modular home placement.
The screw pile foundation system eliminated the need for concrete curing and reduced excavation, allowing the modular homes to be installed efficiently and on schedule. This approach also minimized environmental impact while ensuring long term structural performance.
The completed foundations provide a stable, level, and code compliant base designed to support modular housing in northern climates.
Location: Fort Smith, Northwest Territories
Application: Modular Home Foundations
Foundation Type: Screw Pile System


