Screw Pile Installers was contracted to complete a screw pile foundation installation for a mobile home in Armstrong, BC. The site required a stable and level foundation system capable of supporting the structure across varying soil conditions while maintaining long term performance.
Our team completed site layout and pile positioning before installing each screw pile to engineered depths and torque requirements. The piles were precisely aligned to ensure proper load distribution and a level platform for the mobile home. This approach eliminated the need for extensive excavation and reduced impact to the surrounding property.
Once installation was complete, the foundation was immediately ready to support the mobile home structure, allowing the project to move forward efficiently and on schedule.
The finished result was a durable, code compliant screw pile foundation that provides long term stability and flexibility for future adjustments if required.
Location: Armstrong, British Columbia
Application: Mobile Home Foundation
Foundation Type: Screw Pile System


